Procedure For Correctly Making Concrete Cube Samples For Strength Testing

In order to check concrete strength on site to ensure the batch meets the specified strength it is essential that the cubes are made to the correct standard. The cubes must be made in accordance with British Standard (BS) 1881:1983 Testing Concrete.

Equipment necessary:
Mould for making test cube
Spanners
Scoop
Steel float or trowel
Compacting bar
Shuttering Oil
Curing tank
Bucket to collect sample

As soon as the truck arrives on site a sample should be taken prior to any water being added to the mix. Take the sample to your designated area set aside for making the cubes. You should already have assembled the moulds so that you can immediately start to fill them while the concrete is still workable. It is also a good idea to have coated the inside of the moulds with shuttering oil to enable easy disassembly later.

Generally for each concrete sample 3 moulds should be made in order that the concrete can be tested after 7 and 28 days and the 3rd mould can be held as a spare.

Using the scoop, fill each mould up to about a third full and compact the concrete with the compacting bar with uniform strokes over the area of the mould. Generally up to 35 strokes are necessary to fully compact and ensure there are no air voids but be careful not to over compact as this may segregate the aggregate from the cement.

Next Fill the moulds up to about two thirds full and repeat the necessary compaction before filling to the top and compacting again. Once the filled cube moulds are sufficiently compacted finish the surface of the concrete with the trowel and clean the excess concrete from the mould.

Ensure the individual cubes are identifiable with appropriate labels which should at the very minimum show the date, time and cube ID number.

Once the cubes are cured they should be covered with a damp mat and stored for 16 to 24 hours in an area where the temperature is between 20 and 30 degrees celsius.

Once the necessary time has passed and the cubes have achieved the necessary strength to be de-moulded without damaging the sample, they should be de-moulded, labelled with a marker or crayon and placed in the curing tank at a temperature of 27-30 degrees celsius until they are ready to be tested

Once de-moulding is complete the moulds should be cleaned, reassembled and made ready for the next set of samples.

Recommend : ???????????? Buy Best Price

วันพฤหัสบดีที่ 29 ธันวาคม พ.ศ. 2554

Marble City Company- Diamond Certified Video Profile

For more information, contact them at (650) 395-7909. Marble City opened its doors in 2002 and moved to its current location in San Carlos in 2004. Owner Andrei Gourji has a degree in mining engineering and learned the stoneworking trade from his father in Siberia. Mr. Gourji is familiar with every step of marble and granite fabrication, from extracting stone from the quarry to installing the finished product in your home. That's literally learning the business from the ground up. Marble City specializes in kitchen and bathroom countertops, but they also do shower walls, fireplaces, stair steps, and anything else that can be fashioned from natural stone slab. Their stone products are imported from all over the world, and only the best specimens are selected. Marble City uses thicker 11/4" material that is more durable than what most other companies offer, but remain competitively priced. With their 11/4" material you will not have a seam across the final edge as you would with standard 3/4" materials. The customer gets a superior product at substantial savings. Workmanship is superior too - it's backed by a lifetime guarantee. Marble City now offers an online store where you can purchase natural stone knobs, pulls and other natural stone accessories. You can find the shop and also see examples of their beautiful workmanship by logging onto the Marble City website. Or visit their shop during regular office hours to see their large inventory of 11/4" material. For complete ...

See more : วิศวกรโยธา

วันพุธที่ 28 ธันวาคม พ.ศ. 2554

YYCCC 2010-12-06 Calgary City Council - December 6, 2010

What is THORIUM? youtube.com Here is new process: gordonmcdowell.com Dec 6 captions are generated by YouTube's Machine Transcription, so are not very accurate, but still handy for searching for key words using Interactive Transcript feature. Care about the environment, economy, or just love technology? Check out my documentary about the Liquid Fluoride Thorium Reactor! ThoriumRemix.com www.youtube.com

Tags : Buy Best Price Buy Best Price Buy Best Price

วันอังคารที่ 27 ธันวาคม พ.ศ. 2554

HK-500 Stationary Block Making Machine

HK-500 is a versatile stationary block making machine, which enables production of a wide range of concrete elements including two-layer products. Optimal working area and short machine cycle ensures high productivity. The machine can work with a semi-automatic pallet circulation system in which racks are distributed by a forklift.

Tags : วิศวกรรมโยธา

วันอาทิตย์ที่ 25 ธันวาคม พ.ศ. 2554

วันเสาร์ที่ 24 ธันวาคม พ.ศ. 2554

Six Tips on How to Build a Basement Bar in Your Home

Many of you may have a little basement in your home. Some use it as their laundry area. Some use it as their mini gym. Others use it as an extension room for house guests. But what if none of these ideas draw your attention? Yet you cannot get over the fact that your basement is not being used to its maximum potential. Then you realized that whenever you have huge celebrations at home, your living room is just not enough. Then you start thinking why not convert your vacuous basement into a bar? Bingo! So here are a few tips for you on how to build a basement bar in your home.

1. Visualize - Visualize your idea of a basement bar in your mind. This should be a good starting point on how to build a basement bar. Before anything else, you got to imagine how it is going to look like. Draw it on a sheet of paper. Go down to your basement and figure out which corner you want to put the bar.

2. The Plan - Make a basement bar checklist. After you got a basement drawing in your sketch pad, you should be able to imagine the materials and tools to use in setting it up. Other than wood, you should be able to see things like electrical wiring, lighting fixtures, framing, plumbing, and all other things you can see through in your sketch.

3. Inspiration - Check out your friends' basement bars. Supposing you still do not have a clear view of what needs to consider in this project. You may want to visit your friends who have basement bars. And do not ever forget to ask them pointers in how to build a basement bar. That is probably one of the most reliable help you could get. For sure, your friends would be more than willing to share their experience.

4. Basement Bar Photos - Check out home design magazines. This medium is another source of ideas in how to build a basement bar. The thing is that your plans of realizing this project only happens when you have your concept clear. These types of magazines help you imagine what you hope to achieve with your basement bar because they show pictures. This is a big advantage especially if your grades in art class were very low.

5. The Right Materials - Materials to use. Yes of course you got to know this. In the planning stage, materials and labor cost are usually what determines a project's cost. At this point, it is not enough to just know the basics how to build a basement bar. Extra knowledge is a very important factor as well.

6. Supplies and equipment. Common sense and experience will tell you that when you see a bar, there is always liquor and most often music. Although this can be thought of in details when your bar is almost finished, it may help to include this in your preparations. Maybe know a little bit about what brand of wine, brandy, or whatever liquor you know that can suit your taste. Perhaps your preference has a lot to do with the mood you set in your bar. Then of course knowing a little bit about music equipment can lead you to understand what type of speakers you need to install. Acoustic insulation is also a consideration if you want music piped in to your basement bar.

Now that you have the design plan listed out for your little project, it is time to work on it. The good thing about this is that you can do it yourself. If you have no background in carpentry or interior designing, this is a good time to learn. Then maybe, in the future, you might want to share your experience. You might want to return the favor by giving your personal tips on how to build a basement bar.

See more : Buy Best Price Buy Best Price

วันศุกร์ที่ 23 ธันวาคม พ.ศ. 2554

Bob Marley and The Wailers -400 Years

Bob Marley and The Wailers 400 Years Catch A Fire ©TuffGong/Island 1973 Lycris: 400 years (400 years, 400 years. wo-ooo) And its the same - The same (wo-ooo) philosophy Ive said its four hundred years; (400 years, 400 years. wo-ooo, wo-ooo) Look, how long (wo-ooo) And the people they (wo-ooo) still cant see. Why do they fight against the poor youth of today? And without these youths, they would be gone - All gone astray Come on, lets make a move: (make a move, make a move. wo-ooo, wo-ooo) I can (wo-ooo) see time (wo-ooo) - time has come, And if-a fools dont see (fools dont see, fools dont see. wo-ooo) I cant save the youth: The youth (wo-ooo) is gonna be strong. So, wont you come with me; Ill take you to a land of liberty Where we can live - live a good, good life And be free. Look how long: 400 years, (400 years, 400 years) - Way too long! (wo-ooo) Thats the reason my people (wo-ooo) - my people cant see. Said, its four hundred long years - (400 years, 400 years. wo-ooo) Give me patience (wo-ooo) - same philosophy. Its been 400 years, (400 years, 400 years) Wait so long! wo-ooo, wo-ooo. How long? 400 long, long years.

Tags : GENERAL คุยกับวิศวกรโยธา

วันพุธที่ 21 ธันวาคม พ.ศ. 2554

Paul Wall-Break Em' Off(Yung Gunna Remix)

$crewed-N-Chopped: DJ YungGunna(My Lil'Brudda 4rm another mother) Directed:LarryDaGR8

Tags : เล่นเกมส์ออนไลน์

Building a Metal Lean to Shed - Advantages and Disadvantages

Metal sheds are more economical than those made of other materials. They can be availed in a wide range of sizes, styles, and colors. Make sure to check product warranties by the manufacturer before you purchase metal lean to shed.

You will need some hand tools to put everything together such as a Phillips screwdriver, a stepladder, and a pair of pliers. It would be easier to do the construction with the help of another party. You may hire a contractor or ask a family member to take on the project with you. The building process usually involves these five steps:

1. Laying out the foundation

2. Anchoring the shed floor to the foundation

3. Setting up and constructing the shed walls

4. Roofing

5. Installation of windows, shelves, and/or ramps

A metal lean to shed is more likely to endure the toughest wind conditions if it is attached by screws to a concrete foundation. You may pour a concrete slab over a flat ground surface to serve as the foundation. A wood deck or floor may also be used. Sometimes, manufacturers also make available shed floor frame foundation kits, which you may use.

Arrow Sheds is a leading supplier of prefabricated metal lean to shed kits. It also manufactures individual stand-alone sheds in different sizes and styles. BettyMills.com is one of the places online where you can find a wide range of choices in metal lean to sheds.

Advantages

A metal lean to shed is advantageous to anyone who plans to apportion extra storage space by building a garden shed outdoors. Aluminum, corrugated iron, and galvanized steel are commonly used for construction, including in shed building, because they resist damage caused by harsh weather conditions, fire, rotting, and pests. If you are looking for strength and durability, a metal lean to shed is for you.

Metal is a lot cheaper compared to other materials like wood and vinyl. Metal lean to shed kits are widely available from dealers of outdoor and home equipment. These kits are easy to assemble and come with specific instructions. All the parts you need to set up are included; pre-cut and properly labelled. You can order them online and have them delivered to your home.

Disadvantages

One main disadvantage of a metal lean to shed is that it is prone to rusting, especially if the material used is un-galvanized steel. Aluminum sheds, a relatively more expensive alternative, are less at risk of corrosion. Metal is not a good option if the shed is to be set up in a high-traffic area. Thin metal sheets may dent upon the accumulation of snow or ice. They are also likely to suffer damage from heavy winds.

More review : Buy Best Price

วันจันทร์ที่ 19 ธันวาคม พ.ศ. 2554

วันอาทิตย์ที่ 18 ธันวาคม พ.ศ. 2554

Nick Cave - I let adulation in

Nick Cave Live At The Royal Albert Hall I let love in I let love in The door it opened just a crack, but Love was shrewed and bold My life flashed before my eyes, it was a horror to behold A life-sentence sweeping confetti from the floor of a concrete hole I let love in I let love in I let love in I let love in Well I've been bound and gagged and I've been terrorized And I've been castrated and I've been lobotomized But never has my tormenter come in such a cunning disguise I let love in I let love in I let love in I let love in O Lord, tell me what I done Please don't leave me here alone Where are my friends? My friends are gone O Lord, tell me what I done Please don't leave me here alone Where are my friends? My friends are gone I let love in I let love in So if you're sitting all alone and hear a-knocking at you door and the air is full of promises, well buddy, you've been warned Far worse to be Love's lover than the lover that Love has scorned I let love in I let love in I let love in I let love in I let love in

More review : Buy Cheapest Prices Buy Best Price

วันเสาร์ที่ 17 ธันวาคม พ.ศ. 2554

วันพฤหัสบดีที่ 15 ธันวาคม พ.ศ. 2554

An central attending at a ability bulb agent basement at Deer Creek Station

"It's one of the most critical pieces on the site of the Deer Creek Station, the pedestal for the steam turbine and generator. Now, it's all enclosed, to keep it safe from the elements. But we got to take an inside look." (Michael Loose): "It's really complex, all the different stuff, so you can't have a ton of people in here, everybody would get in each other's way. (steps aside to let guy through)" It's a tight space, inside what will soon be filled with concrete. (Colin Zwaschka): "They're working on constructing a concrete pedestal that'll support the steam turbine and also the steam turbine generator." Colin Zwaschka works for a contractor for Basin Electric... and Michael Loose works for Boldt Construction. They say work on the steam turbine and generator pedestal is complex. (Michael Loose): "A typical, they call this a tabletop, is on the top here, that's what they call a tabletop ... It's all up in the air, for one thing, and then all the different elevations, you gotta try holding the forms in mid-air, to hold concrete." (Colin Zwaschka): "For the turbine and generator, there's a lot of weight there, as well as a lot of operating stresses from the rotation of everything." Piles beneath the pedestal go down 65 feet into the ground to support it. Rebar is placed together closely for support. And when a concrete pour is done, it's done carefully. (Colin Zwaschka): "It's a lot more tedious than just a big open slab. A lot less area to work, but still very important ...

See more : บทความวิศวกรรมโยธา คุยกับวิศวกรโยธา

วันอังคารที่ 13 ธันวาคม พ.ศ. 2554

How to Erect a Concrete Column

Concrete columns are used for carrying loads of a building. They transfer the same to a suitable soil bearing capacity. They carry loads horizontally, vertically and laterally. They can be erected as free standing, used for hanging gates. Alternatively they can be incorporated within the walls of a building structure. Concrete columns are made from steel and concrete cast in a form work. These are done in circular, rectangular or square shapes.

In erecting concrete columns the load to be carried is considered. This determines the size of column and type of reinforcement to use. The process of erection commences by setting up a base. A pit is first excavated to a suitable soil bearing capacity in depth. Blinding to the pit is done to protect the soil touching the steel reinforcements. When the base is cast, steel is exposed. This reinforcement is used as starter bars for the column.

Form work of the required column size is formed first aside. The already tied steel is joined together with the starter bars. This ensures the column starts from the ground upwards. The steel should be free from oils and rust. Use binding wire to tie together all steel. Its important to cast concrete in lifts. This should not exceed two thousand five hundred millimeters in height. When the steel work is complete, then form work assembly starts.

The form work for erecting a column is fixed by opening the sides. Its then slid to have the steel inside the box. Once the box is upright, the form work is then fastened and supported on all sides. Concrete is then poured and vibrated until it reaches the top of the box. It is left for seven days. Curing is done from the top. After seven days the form work is then removed to expose the cast column. This is continuously cured for another Seven days.

Related : Buy Best Price Best Cheap Price Buy Best Price

Kings of Leon - Trani [Hollywood Bowl 7/12/10]

Trani @ the Hollywood Bowl 7/12/10 Crowd seemed like a bunch of mainstream poopfaces. Whatever though, it was still awesome!

Thanks To : โยธาไทย

วันอาทิตย์ที่ 11 ธันวาคม พ.ศ. 2554

วันเสาร์ที่ 10 ธันวาคม พ.ศ. 2554

GUERILLA MAAB - Fondren and Main - Feat. DJ Screw

This track pulled from DJ Screw - N 2 Deep. Original track from Guerilla Maab's 1999 release - "Rise" (Z-Ro, Dougie D., TAZ)

More review : Buy Best Price

วันศุกร์ที่ 9 ธันวาคม พ.ศ. 2554

Easy Concrete Demolition & Rock Breaking by Dexpan Non Explosive Controlled Blasting Demolition

First part (4 minutes) shows Dexpan Demolition job photos. Second part (7 minutes) shows Demolition of concrete and rock is as easy as drill, mix and pour. Dexpan is a powder with amazing 18000 PSI expansive strength when mixed with common water. Poured into drilled holes, Dexpan breaks reinforced concrete & rock safely and quietly, while providing SILENT cracking demolition. As an alternative to explosives blasting, traditional demolition tools and quarry mining equipments like jackhammer, wrecking ball, hydraulic breaker, diamond blade concrete saw, diamond wire sawing machine, chain saw stone cutter and demolition jack hammer, Dexpan helps to cut cost, work time and increase safety, Plus its silent demolition, Dexpan is perfect for both demolition DIY users and professional demolition contractors, drilling and blasting contractors, excavating companies who work in the residential, schools, hospitals, airports, and other noise, ground vibration, air blast, dust restricted area. Since Dexpan provides silent controlled demolition according to drilling patterns, it is very easy to break reinforced concrete and all kinds of natural stone into desired sizes and shapes, No blasting permit, high cost of training, storage, shipping and insurance needed. Dexpan Non Explosive Controlled Demolition Agent works safer, easier and more cost effective. Visit us at www.Dexpan.com for more information, see job photos & videos.

Friends Link : GENERAL สมัครงานราชการ ABOUT US

วันพฤหัสบดีที่ 8 ธันวาคม พ.ศ. 2554

How to Lay Hardcore Under Concrete Floor Beds

Hardcore is the material put under floors. It is used as a sub base after building the foundation wall to make up levels before casting the ground floor concrete slab. The recommended is hard stone ballast or quarry waste that should not pass a sieve of more than six inches when broken down. This shall be free of weeds, roots, vegetable soil, clay, black cotton soil or other unsuitable materials. Broken stones or brick cuttings can also be used as hardcore.

To lay hardcore under floor beds, use well graded smaller pieces mixed with fine materials. This will give a dense compact mass after consolidation. This shall be laid in layers not exceeding ten inches of consolidated thickness. Sufficient fine materials shall be added to each layer to give a gradation necessary to obtain a solid compact mass after rolling. A ten tonne smooth wheeled or two tone vibrating roller should be used to compact each layer.

Compact each layer with eight passes of the roller when laying hardcore under floor beds. Add sufficient water with every pass to obtain maximum compaction. To each layer add a fine layer of sand or quarry dust forced into the hardcore by a rolling vibrator. All the materials used must always be dry to avoid caking or stickiness. This may allow pockets of air or free spaces. This may sink when the hardcore is loaded with weight. If the sand is absorbed into the holes between hardcore then keep compacting.

Thoroughly compact the hardcore filling under floor beds until sand is not absorbed. The top surface should be made level. The levels are done or graded to the required falls. After this is done a blinding layer of similar broken materials is added. This is of at least one inch in thickness. A ten tonne roller is used to smoothen the surface. This mass of hardcore is now ready for anti termite, damp proofing and mesh reinforcement material before concreting the ground floor slab.

Friends Link : Buy Lowest Prices Buy Cheap ????????????

วันพุธที่ 7 ธันวาคม พ.ศ. 2554

INTERIOR DECORATIVE CONCRETE STONE DESIGNS

Hi I'm Jody Smith Owner/ Artisan of Overlay Solutions, LLC located in Summerville, SC. This is the full video of a recent vertical concrete project created in Summerville, SC. This project consist of all hand carved concrete with custom solid oak wood furnishings and exposed stone located in the bar area. Special Thanks to verticalartisans.com http and www.walttools.com for providing the resources that make the creation of the project showed here a possibility. Our decorative concrete techniques at Overlay Solutions insures you a one of a kind finish with true realism. We enjoy serving Charleston, Summerville, Goose Creek, Daniel Island, Folly Beach, Mt. Pleasant, Isle of palms, James Island, Johns Island, Monck Corner, well truly the entire lowcountry. We have completed jobs in Hendersonville, NC located in the beautiful Blue Ridge Mountains. Overlay solutions takes an artisan approach to decorative concrete and we are not a production based company. Thanks for watching and please rate & subscribe I will continue to create more videos and provide useful information to the channel. Check Out our sites www.overlaysolutions.com blog.overlaysolutions.com overlaysolutions.blogspot.com

Friends Link : Civil Engineering หมวดงานระบบไฟฟ้าและเครื่องกล

วันจันทร์ที่ 5 ธันวาคม พ.ศ. 2554

Laminate Flooring How To - Covering Concrete Stairs With Laminate

You have a beautiful laminate floor and you're wondering if you should finish the concrete stairs in laminate to give the space a cohesive, designer feel. First of all, is it possible? Can you cover concrete with laminate? The answer is yes. In fact, if you've ever covered wooden stairs, the process is similar, except that the nosing installation is a little trickier.

What You'll Need

To accomplish this task you'll need:

PL200 or stronger construction glue
Skill saw for cutting laminate
Chop saw for cutting metal nosings
drill with a concrete bit
electric screwdriver
plastic plugs
broom

I recommend using metal nosings as these are stronger, and will hold better on concrete stairs. (Laminate nosings that come in a kit are also trickier as the tracks need to be in exactly the right spot, and there isn't a lot of standardization--every manufacturer makes a slightly different size/style of laminate nosing).

What to Do

Start by sweeping the stairs and cleaning up any shavings or dust. You'll need a clean surface for the glue to adhere properly to the concrete and laminate. Once the area is clean, start with the risers first.

Measure, mark and cut each laminate plank to fit the riser with the groove side facing downwards. Glue the riser and the back of the plank, and secure the plank in place, again, making sure that the groove is at the bottom of the riser. Once all the risers are glued, you're ready to start on the nosings.

Begin by measuring and cutting the metal nosings to fit. Mark on the concrete where the screws will go, then using a drill with a concrete bit, drill the holes. Place a plastic plug in each hole. Number the nosings so that you match each one to the correct tread when you screwnail them in later.

Measure, mark and cut each laminate plank to fit the tread with the groove side facing inwards to meet the bottom of the riser. Arranging the planks so that the groove on the riser meets the groove on the tread makes for a clean, professional edge in the corner. Glue the tread and the back of the plank and secure the plank in place, making sure that groove faces inward.

Stair nosings are intended to finish the look by capping the lip of the stair. Unfortunately, with concrete stairs this can be a little tricky as the lip on the stairs is often thicker than the actual stair nosing. If this is the, cut a laminate plank so that it's wide enough to cover the the concrete lip, and glue it to the face of the lip on each tread. Then secure the nosing over top by screwnailing it through the laminate tread into the pre-drilled holes in the concrete. (If you've already covered the lip-face with laminate, you can glue the nosing to the laminate for extra adherance, and then screwnail the top of the nosing into place.)

Thanks To : Buy Best Price Buy Best Price

Davos Annual Meeting 2010 - Rethinking Compensation Models

www.weforum.org 27.01.2010 A 2009 study revealed that 70% of the 200 largest companies (by market capitalization) in the S&P 500 Stock Index reported changes to their executive compensation programmes. How should compensation systems be redesigned in the wake of the "Great Recession"? Shumeet Banerji, Chief Executive Officer, Booz & Company, United Kingdom Mark Mactas, President and Chief Operating Officer, Towers Watson, USA Stephen G. Pagliuca, Managing Director, Bain Capital, USA Peter A. Weinberg, Founding Partner, Perella Weinberg Partners, USA Moderated by Adi Ignatius, Editor-in-Chief, Harvard Business Review, USA

Friends Link : ABOUT US ห้องค้าขาย

วันเสาร์ที่ 3 ธันวาคม พ.ศ. 2554

Birdman Ft. Lil Wayne - I Run This Bitch with lyrics

[Birdman] I run this bitch [Lil Wayne] And ima keep runnin ima keep runnin but im neva runnin outta money ima dog ima stunt if i dont do nothin and my car so pretty all these hoes wana f**k it i got pussy wet paint big boy shoes soft ass seats and my trunk go boom i gotta black ass gun and a bad yellow bitch and it looks like ima die like this [Birdman] cuz we be stuntin on these bitches get money on these bitches $250 on the wrist nigga we be the illest we be the realist CMB nigga uptown soldier with the money to the ceilin shinin like a diamond from a eagle to a pigeon birds on the wire 100 deep and we chillin finga on the trigga, thats the uptown livin high to the sky no dobbin for fishes hustlin, doin donuts in the lamb candy on the slam 50 on the ave 100 at the crib get it how you live stuntin on these bitches red diamonds how i feel I run this bitch [Lil Wayne] And ima keep runnin ima keep runnin im neva runnin outta money ima dog ima stunt if i dont do nothin and my car so pretty all these hoes wan f**k it i got pussy wet paint big boy shoes soft ass seats and my trunk go boom i gotta black ass gun and a bad yellow bitch and it looks like ima die like this [Birdman] Im a uptown solider Known high rolla Money go get her, MLB all over Hustlin with the birds, go and take it off his shoulder Grinding with the homies, got the game out the nose 100 gs wrap, hood with a strap Blowin on the dojo, nigga stuntin in a 'lac Chicken in the oven, wall safe for the stack Bought a ...

Recommend : ห้องเรียนวิศวกรรมโยธา Civil วิศวกรรมโยธา

วันศุกร์ที่ 2 ธันวาคม พ.ศ. 2554

How to Build an Outdoor Pizza Oven

If there is one smell that will bring everyone running, it's that of fresh pizza. Admit it, your mouth just started watering a little. Now imagine the smell of fresh pizza intermingled with that of your grill.

Drool!

Learning how to build an outdoor pizza oven is a pretty simple job. It will take time and some sweat but the pay off is certainly worth it as you become the king griller of the neighborhood.

The first thing you need is a flat level surface to start building. If you have a cement patio you're set. If not you might want to pour a slab of concrete.

Pouring a slab of concrete doesn't take much except time.

All you need to do is remove a layer of topsoil slightly larger than the foundation footprint.

Level the area that's going to be poured.

Build a framework for the slab. All you need are some 4-inch tall strips of wood squared and level set in the footprint.

Pour the concrete.

Use a scrap piece of wood longer than the pour to scrape and level out the fresh cement by raking it along the framework.

Let it dry at least 24 hours.

Congratulations! You've now built a great sturdy base for the new outdoor pizza oven.

You'll need a lot of bricks for this baby so have the hardware store deliver them as close to the concrete pad as possible. You want to build an oven, not tote bricks from one end of the yard to the other.

You don't need anything gigantic for a perfect pizza. A simple 36-inch square base is more than large enough.

Start stacking bricks to make a nice square pattern. Make sure nothing is loose or wobbly.

Once you've stacked up to a height of about 30 inches it's time to build the firebox.

Simply lay a single layer of bricks stacked on end along the outside edge of the back and sides of your oven. Leave a spacing of 4 bricks along the back wall. So the smoke has a way out of the firebox.

Once you've finished stacking the bricks cut a piece of sheet metal to size and place it on top of the wall.

Stack another layer of bricks on top of the sheet metal. Once again stack bricks lengthwise along the back and sides of the pizza oven. And lay another piece of sheet metal on top of them. This will be the oven portion of your outdoor pizza oven.

Add another layer of bricks on top of the sheet metal and voila! Your outdoor pizza oven is complete. Just light the fire. Get the pizza oven up to temperature and slide in a fresh pizza, calzone, or whatever will make the neighbors jealous.

Learning how to build an outdoor pizza oven is time consuming but so worth it once you taste that first slice of fresh pie. The neighbors will be beating down your door for the great taste of homemade outdoor pizza.

Thanks To : Buy Best Price Buy Best Price

วันพฤหัสบดีที่ 1 ธันวาคม พ.ศ. 2554

Recollections of the Yellow House -- Monteiro (1989)

Recordações da Casa Amarela -- João César Monteiro (1989) "This quirky Portuguese comedy won a silver lion at the 1989 Venice Film Festival. The story concerns the irrepressible Joao de Deus (played by the director, Joao Cesar Monteiro), an ill-kempt, lusty and none-too-honest resident of Violeta's boarding house, which happens to have yellow walls. Joao, who has no visible means of support, is in his fifties, and is not above cadging money from his 70 year old mother, who still works as a cleaning lady. He has a wistful sort of lust for the young ladies in the boarding house, and gets a kind of thrill when he is permitted to take a bath in their used water. He strikes up a friendship with a slightly stupid girl who is a mite promiscuous, and even has a brief sexual encounter with her himself. Many slightly "off" encounters occur during the remainder of the film, but despite Joao's potentially defeating setback near the end, it appears that it won't be long before he's back in action."

See Also : วิศวกรรมโยธา ทำเนียบผู้รับเหมา ตำแหน่งงานวิศวกรรมโยธา